Why it matters

We own our rigs and train our own operators, so the piling on your project is never handed to a subcontractor.

The rest of the fleet

  • Crawler crane lifting a long steel cage beside a bored piling rig on the ECRL
    02 Lifting

    Crawler Crane

    KOBELCO 7055

    A tall crane that moves on tracks. It lifts the steel cages and casings into the pile holes and moves heavy loads around site.

  • Hitachi excavator marked Samamaju working next to a bored piling rig
    03 Earthworks

    Excavator

    ZAXIS 200

    The everyday digger. It digs, levels and clears the ground so the rigs have a firm, safe place to work.

  • Steel reinforcement cages and casings laid out on site
    Pictured: steel cages built from cut and bent bars
    04 Steelwork

    Bar Bender & Cutter

    Vikyno RV 125 Diesel, 42 mm

    Cuts and bends steel bars, up to 42 mm thick, into the shapes that make up the steel cage inside every pile.

  • Concrete blocks stacked on a finished pile for a load test
    Pictured: a pile load test on site
    05 Testing & support

    Site Support Kit

    Point load tester, pumps, welding sets, generators

    The kit that keeps each site checked and running: rock strength testing, water pumps, welding sets and power.

Need our rigs and crews on your next project?